On site now
Dated updates and photos from the sites we are working on now.
Latest updateNovember 2026
Inside the house at Romeral, new brick walls are going up: some close old openings, others form new partitions and doorways. New water pipes run along the ceilings and down into the walls, the bathrooms have the frames for their wall-hung toilets, and in places the walls are already being closed over the new pipes.
The pool is retiled and filled, and behind it the house has its new white façade and its large windows. Inside, the bathrooms are taking shape, the first vanity unit already in place.
Underfloor heating is being laid in the bathrooms, and the frames for the wall-hung toilets are in. The air-conditioning units sit in the new ceiling frames, the plasterboard ceilings are up, and some rooms are already plastered smooth.
The metal frames for the new ceilings are going up, with the air-conditioning ducts above them, and the first plasterboard is on the walls. In another room the walls and ceiling are already plastered smooth.
Latest updateOctober 2026
The staircase is plastered smooth, with a curved wall that follows it up, and its steps are now clad in pale slabs.