  1. Latest

    Underfloor heating is being laid in the bathrooms, and the frames for the wall-hung toilets are in. The air-conditioning units sit in the new ceiling frames, the plasterboard ceilings are up, and some rooms are already plastered smooth.

  2. Inside, the walls are stripped back and chased for the new wiring, the conduits run across the ceilings, and the air-conditioning units are up. In a bathroom, the new water pipes are in.

  3. The work begins: the old kitchen units, wardrobes and doors come out, and the walls are marked up for the new layout. One bathroom is still as it was.